
Client
D.R. Horton
Location
ʻEwa, Oʻahu
Years
2018–ongoing
Scope
Mass grading, site development, roadway, and utility installation
Challenge
The 20-year program required phased site development beside occupied neighborhoods as plans and regulatory requirements changed.
Approach
Royal maintained an on-site operation for grading, roadway, utilities, survey, dust control, and phased turnover.
Result
The work prepared buildable, utility-served land for more than 11,000 homes on Oʻahu.


Next project
Honolulu Rail Transit